Strengthening local power supplies
Freedom, NG Bailey's power division, delivered an 11kV network reinforcement scheme for UK Power Networks (UKPN) at Abbotts Central Primary in Abbotts Langley, under the DCD contract. The scheme involved laying approximately 1km of 300mm ALi Triplex cable and removing three circuit breakers at three different locations. We also installed four new ring main units (RMUs) to ring a section of the 11kV network.
Keeping a village informed and moving
Works of this kind can cause extensive disruption to a village. We worked closely with local residents and council members and kept all parties informed at each key stage. We used Microsoft Project to build a programme of works that coordinated resource, outages and street works. Specialist lifts were completed at the three locations to remove the old switchgear and position the new.
A compliant, well-equipped approach
We worked closely with the council and to the New Roads and Street Works Act (NRSWA). Every team member worked to the correct procedures and had the right tools and equipment for their tasks.
Outcome
The works were completed to schedule, to the client's scope and with no design variations.